Wison lays keel for TPAO’s Sakarya Phase 3 FPU with 25-MMm3d gas export capacity
Wison lays the keel for TPAO’s Sakarya Phase 3 FPU, designed to export 25 MMm3d of gas and operate in 2,150 m of water off Türkiye.
Wison lays the keel for TPAO’s Sakarya Phase 3 FPU, designed to export 25 MMm3d of gas and operate in 2,150 m of water off Türkiye.