Temporary Works Design, Maintenance and Inspection
A sheet piled cofferdam was installed within 1.5m of a live railway line to facilitate gas pipeline strengthening works. Timbers,…
HSE Download-J. Murphy - Temporary Works (pdf - 416KB)Temperature Humidity Index (THI)
Workers exposed to extreme heat while work in hot environments may be at risk of heat stress. Exposure to extreme…
HSE Download-LESSON LEARNT_06_2023_en (pdf - 316KB)Electric Arc with OHL
In a cloudy and humid day, a sideboom was travelling under a High Voltage Overhead Power Line (10 kV) when…
HSE Download-2022-11_SAFETY ALERT_Electric arc with OHL_en (pdf - 236KB)